Salt-worn. Local. Straight-cut.5% off for pensioners07763 100 477 · hello@ramsgatehedges.co.uk
Ramsgate Hedges & Tree ServicesRoyal Harbour · Cliff-top · Thanet

← All guides · Establishment & care · Updated October 2026

New hedge aftercare in Ramsgate: the two-summer watering and mulching schedule for Thanet chalk

Manston averages around 615mm of rain a year, which makes Thanet one of the drier parts of England. On the chalk that underlies most of Thanet, that water disappears fast. Newly planted hedging in Ramsgate fails mostly not from disease or poor plant quality but from water stress in the first two summers. The watering required here is more frequent than for clay soil and should be kept up for two full growing seasons, not one.

~615 mmAnnual rainfall, Manston (Met Office 1991-2020)
2 summersKeep watering through summers one and two
Deep soakSlow and thorough, not a light sprinkle
MulchAlong the planting line, clear of stems

Wildlife and Countryside Act 1981, s.1

This guide covers aftercare of newly planted stock, not trimming. However, any work on adjacent established hedges during the establishment period must follow the nesting-season rules. It is an offence to intentionally or recklessly damage or destroy a wild bird's nest while it is in use or being built. The accepted guidance window (RSPB, GOV.UK) for hedge cutting runs 1 March to 31 August; the Act itself sets no dates. A new hedge should not be trimmed in its first year in any case: let it grow freely through the first full season to build root mass and canopy.

Why Thanet chalk behaves differently from mainland UK soils

The chalk and chalky loam that covers most of Ramsgate, the East Cliff, the West Cliff and the Thanet villages is free-draining to the point of hostility for newly planted stock. Rain in June, July and August can pass straight through the top 30 cm and be inaccessible to shallow new roots within hours of falling. The same volume of rain on a London clay or a Midlands loam would sit in the root zone for several days.

This is compounded by Thanet's sunshine (Manston averages about 1,800 hours a year, one of the sunnier parts of England). More sun means more evapotranspiration from both soil and plant. A newly planted Griselinia or cherry laurel on an exposed East Cliff plot is losing moisture from every leaf surface continuously through June, July and August, while the root system has not yet extended far enough into the surrounding soil to compensate.

The practical result: watering schedules written for typical UK conditions are not adequate for Thanet. A guide that says "water twice a week in dry weather" is written for soil with more water-holding capacity than Thanet chalk provides. Here, the equivalent schedule is more frequent, with a larger volume per application.

Month-by-month aftercare schedule: year one

October to March (planting and first winter)

Bare-root hedging plants are available from early November through to late March and establish well when planted during dormancy. Container-grown stock can go in from October onwards; October and November are good months because the soil is still workable and warm enough for roots to begin settling before the first hard frost.

At planting, the key actions are:

Watering through November to March is generally not needed on a chalk site: winter rainfall, even at Thanet's modest totals, is adequate for dormant stock. The exception is a prolonged dry spell in January or February with persistent cold easterly winds that desiccate evergreen foliage without delivering rain.

April to September (summer one)

April is when active watering begins. As soon as new growth starts and air temperatures lift, the hedge plants are drawing on moisture the chalk cannot hold for long. The watering schedule for summer one on a Thanet chalk site:

Top up the mulch layer in April or May: it breaks down over winter and the depth drops. Renewing it before the dry season begins is one of the highest-value actions in the year-one aftercare programme.

MidsummerPeak watering demand on chalk
ClearKeep mulch off stems (collar rot prevention)
WideMulch strip either side of the planting line
Nov-MarBare-root planting season

October to March (second winter)

After summer one, most hedging plants will have made their first significant root extension into the surrounding soil. Evergreens will have put on new growth that varies by species and season (cherry laurel at the fast end; yew and holly at the slow end). Deciduous species will have leafed out, grown, and shed their leaves again.

This is the moment to assess the hedge. Look for:

There is no need to trim the new hedge in autumn of year one. Let the plants carry whatever growth they made through the first season: this growth represents stored energy and a developing root system. The first formal trim typically happens in late summer of year two or year three, depending on species growth rate.

Year two: the watering schedule that most people abandon too early

The most common mistake on a Thanet chalk site is treating year two as "sorted." The hedge looks established. It has leafed out, it has grown, it has survived a winter. The temptation is to stop the intensive watering and let it get on with things.

On chalk, this is the point where the hedge is still genuinely vulnerable. The root system has extended, but it has not yet reached the depth or lateral spread that allows the plant to survive a three-week dry spell in July without water. On heavier soils with more moisture-holding capacity, year-two plants often can do this. On Thanet chalk, the majority cannot.

Repeat the same summer watering schedule in year two: regular deep watering on chalk during dry spells from June to August, at the same volume as year one. The only change from year one is that established plants are generally more efficient at using the water they receive, so you may be able to stretch the interval in June when the weather is cooler and there is some rainfall.

Container-grown stock planted in October or November of year one typically reaches a point where it can manage a Thanet summer without supplementary water by the end of year two, provided mulch is in place. Bare-root whips of slow-growing species (yew, holly, spindle) may need careful watering into year three on an exposed chalk site.

The wind exposure problem on East Cliff, West Cliff and exposed Thanet plots

Water stress on an exposed Thanet plot is not only a function of soil drainage and rainfall. The North Sea salt wind arriving from the north and east desiccates foliage directly, pulling moisture through the leaf surface faster than in a sheltered position. On a directly exposed East Cliff or West Cliff front, wind desiccation can match or exceed root-zone water stress in its effect on newly planted stock.

Two practical responses:

Gap-filling in an existing hedge: the additional challenge

Filling a gap in an established hedge is harder than planting a new hedge from scratch. The competition for water and nutrients from adjacent established root systems is significant: close to a mature hedge stem, root density is high enough to strip moisture from the topsoil within days of rain. A new plant put into that zone is competing immediately with a much larger and better-established root system.

For gap-filling on chalk:

Species-specific notes on the two-summer rule

The two-summer watering schedule above applies broadly, but different species have different establishment speeds:

SpeciesContainer vs bare-root?Typical establishment, Thanet chalkActive watering needed
Cherry laurelEitherFastSummers 1 and 2
GriseliniaContainerModerateSummers 1 and 2
Hawthorn (bare-root)Bare-rootModerateSummer 1 critical; summer 2 as needed
Beech (bare-root)Bare-rootModerateSummers 1 and 2
YewContainerSlowSummers 1, 2 and possibly 3
HollyContainerSlowSummers 1, 2 and possibly 3
EscalloniaContainerModerateSummers 1 and 2, particularly on exposed plots

Want this looked at?

Send a couple of photos and your postcode to hello@ramsgatehedges.co.uk or 07763 100 477.

Sources: RHS new hedge planting and aftercare guidance; Met Office Manston 1991-2020 climate averages; RSPB and GOV.UK nesting guidance; Wildlife and Countryside Act 1981 s.1; GOV.UK Countryside Stewardship capital items (BN7, BN11).